PRE-SUBMISSION DECISIONS
EXTERNAL · owner: originator · reachable
Open pre-submission decisions remain. Each one closes when a named person at an institution decides, signs, measures, or reserves something — not when code is written.
| Item | State |
|---|---|
| IRB application submitted | No |
| IRB approval | No |
| OSF preregistration filed | No |
| Human data collected | No |
| Faculty co-PI agreed | No |
| UAH agreement | No |
| Room confirmed | No |
| Equipment confirmed | No |
| Recruitment authorised | No |
| Cleared to run participants | No |
Derived from irvinbuffalo/det-knowledge @ af2d884
The chain stops at pre-submission-decisions. 7 node(s) are outstanding.
EXTERNAL · owner: originator · reachable
Open pre-submission decisions remain. Each one closes when a named person at an institution decides, signs, measures, or reserves something — not when code is written.
EXTERNAL · owner: uah · blocked upstream
Until a UAH faculty member agrees to be co-PI, there is nobody who can submit an IRB application, reserve a room, or open a participant pool. Every node below waits on this single conversation.
Depends on: pre-submission-decisions
EXTERNAL · owner: uah · blocked upstream
UAH IRB submissions are made through Kuali Build. Nothing has been entered there, and a non-UAH investigator may not be able to submit at all — that is itself an open decision.
Depends on: faculty-copi
EXTERNAL · owner: irb · blocked upstream
The investigator proposes a review category; the IRB decides it. There is no determination of any kind and no protocol number.
Depends on: kuali-submission
EXTERNAL · owner: osf · blocked upstream
The preregistration is a frozen internal draft. It is copy-ready, and it has not been filed. There is no registration and no DOI.
Depends on: irb-determination
EXTERNAL · owner: uah · blocked upstream
A room with at least 10 m of clear floor diameter must be booked and measured, university-managed encrypted storage designated, and equipment confirmed. None of the three has been done.
Depends on: osf
EXTERNAL · owner: irb · blocked upstream
12 prerequisite gates are outstanding. No participant may be recruited, consented, or run.
Depends on: room-storage-equipment