Roadmap

The order of work

This is an order, not a schedule. No week counts appear below, because institutional review time, room availability, and recruitment are outside this project’s control and a date here would be a promise nobody has made.

  1. 1. PRE-SUBMISSION DECISIONS

    Status: external · owner: originator · reachable

    Open pre-submission decisions remain. Each one closes when a named person at an institution decides, signs, measures, or reserves something — not when code is written.

  2. 2. FACULTY CO-PI

    Status: external · owner: uah · blocked upstream

    Until a UAH faculty member agrees to be co-PI, there is nobody who can submit an IRB application, reserve a room, or open a participant pool. Every node below waits on this single conversation.

  3. 3. KUALI SUBMISSION

    Status: external · owner: uah · blocked upstream

    UAH IRB submissions are made through Kuali Build. Nothing has been entered there, and a non-UAH investigator may not be able to submit at all — that is itself an open decision.

  4. 4. IRB DETERMINATION

    Status: external · owner: irb · blocked upstream

    The investigator proposes a review category; the IRB decides it. There is no determination of any kind and no protocol number.

  5. 5. OSF

    Status: external · owner: osf · blocked upstream

    The preregistration is a frozen internal draft. It is copy-ready, and it has not been filed. There is no registration and no DOI.

  6. 6. ROOM / STORAGE / EQUIPMENT

    Status: external · owner: uah · blocked upstream

    A room with at least 10 m of clear floor diameter must be booked and measured, university-managed encrypted storage designated, and equipment confirmed. None of the three has been done.

  7. 7. AUTHORIZED SESSION

    Status: external · owner: irb · blocked upstream

    12 prerequisite gates are outstanding. No participant may be recruited, consented, or run.